Of
Time and the Riverfront
Some
seasoned ideas on EWEB site planning
BY
JERRY DIETHELM
Fourteen years ago
I pointed out that it made no sense to have an EWEB maintenance
yard squatting on the city's most promising point of connection
to its downtown riverfront. I'm talking about the area that extends
south from the EWEB headquarters building to the old Art Deco steam
plant.
This was a very unwelcome observation at the time.
EWEB had just concluded a yearlong master planning process and had
concluded that it would be best to consolidate their operations
on this riverfront site for the foreseeable future. Exceptions to
their hard-won conclusions proved awkward at best.
Ah, the foreseeable future. I guess it depends on
who's doing the foreseeing.
At the time, I was the city's lead planning and
urban design consultant for the Ferry Street Bridge Corridor project,
examining the transformative potential of the south and north banks
of the river that might accompany a replacement of the 1949 bridge.
I foresaw, for example, that a new Ferry Street
Bridge could be designed to touch land a little farther north than
the present one does along Club Road, allowing a wide green strip
of Alton Baker Park and a new south-facing esplanade to extend beneath
the bridge landing and create a new north shore.
A rebuilt and realigned viaduct could create a significantly
wider and more accessible EWEB site instead of crowding the old
quonset hut storage building as it now does. Careful engineering
studies at the time proved, much to my personal disappointment,
that it wouldn't be feasible to eliminate the viaduct altogether
and dive beneath the railroad tracks because of the long distance
it takes to ramp down and then to get back up. Plus there was the
additional problem in this area of the need for constant tunnel
dewatering due to the high water table of a river terrace.
I asked EWEB steam plant managers if they foresaw
the phasing out of their hogged fuel pile, the small mountain of
leftover forest waste that they fed into their furnaces to produce
steam. Not in the foreseeable future, they responded. But the university
was already phasing their pile out, and it seemed clear —
at least to some — that there would likely be another transitional
site of opportunity on the EWEB riverfront.
Dorothy Anderson, then an EWEB board member, thought
the sawdust mountain site might make an excellent Millrace confluence
park and the steam plant a fine museum. We should probably ask our
authentic local visionaries to all wear red socks — or some
kind of distinguishing mark — so that there's a better way
to tell when one's around.
We voted not to replace the old bridge, but in the
process learned valuable planning lessons about the potential reuse
of the EWEB site whenever we returned to returning to the river.
Time passed. And it still made no sense to
have a maintenance yard as our downtown riverfront connection, not
even to EWEB, who began to look for a new location.
Anticipating a move, a city-hired California consultant
recommended an ambitious plan for mixed-use riverfront development,
which included the extension of 6th and 7th Avenues along the railroad
corridor. I pointed out the impact of such a wide barrier, over
200 feet, that this would create.
Did it make any sense that in a time when other
cities were tearing down their riverfront barriers that we were
about to build our own? Did anyone realize that if we ever wanted
to get people, cars and perhaps the Millrace under that barrier
— two state highway right-of-ways and a 60-foot railroad right-of-way
— that it would be like traveling under the length of a Portland
city block? I called it the rat-hole to the river. Wisely, the city
dropped relocating 7th Aveune, a third of the barrier, from the
mix.
Next came the potential location of McKenzie-Willamette-Triad
Hospital on the EWEB site. It provided an additional dislodging
nudge to EWEB and re-raised the critical issue of site access. It
would take $12.5 million to adequately provide for hospital access
on the riverfront. Why? Because of the railroad and the addition
of 6th Avenue that blocked the connection.
The transportation consultant's solution was to
extend Patterson north from Broadway and tunnel under the highway
and the tracks. We're quite fortunate the hospital finally jumped
site because this wouldn't have worked either. This misplaced underpass
was to resurface in the narrow space in front of the steam plant
where there was no room to climb out of a 20' hole gracefully. I
named this scheme, "Return to the river in trenches."
Today, a new group is being formed to plan the future
of the EWEB site. With the benefit of 20-20 hindsight, I'll offer
the following free advice:
1. Don't underestimate the problem of riverfront
access. Access and land use are flip sides of the same coin.
2. Two up and one down. That is, keep the two existing
RR crossings, the one at 5th and the one at Hilyard (no matter what
UP wants), and add a significant new portal in the middle, east
of the new courthouse. Hint: You'll need the city-owned triangle
of land east of the U.S. Courthouse to make this work.
3. Follow the Millrace back to the river.
Jerry Diethelm is a Eugene architect, landscape
architect, and planning and urban design consultant.
|